24/7 recovery support+1-888-385-5513
Fire recovery project desk
Project coordination

Request availability

Share the equipment, location, and timing your operation needs. We will review the request without promising inventory or arrival time.

Call now +1-888-385-5513

Online submission is being prepared. Complete the project brief, or call +1-888-385-5513 for immediate assistance.

Project inquiry

Open secure quote request ↗

Fire recovery · Food-service continuity

Protect Cold Storage during Fire Repairs

Protect Cold Storage during Fire Repairs. Practical planning guidance for maintaining institutional and commercial food service during fire cleanup and kitchen repairs.

24/7
phone support
Site-specific
facility planning
Nationwide
planning coverage
12ft Refrigerated Trailer (Tier 1-4): 12ft refrigerated trailer interior cooling system
COMMERCIAL EQUIPMENTCommercial Kitchen Fire Recovery 12 ft Refrigerated Trailer Rental or Lease. Discuss weekly rental, monthly rental, or yearly rental and lease options for protected cold storage while the permanent kitchen is repaired. Confirm temperature range, electrical service and loading access for the selected site. Call us now at +1-888-385-5513, available 24/7.
RECOVERY PLANNING GUIDE

Use this guide during early recovery planning.

A commercial kitchen shutdown affects food safety, staffing, procurement, delivery and the people who depend on the operation. Treat protect cold storage during fire repairs as a coordinated facilities project, with one owner for decisions and a written record of assumptions.

Planning priorities for this topic

  1. Establish a decision owner and a daily meal-service requirement.
  2. Separate immediate stabilization from the longer restoration and temporary-facility schedule.
  3. Record assumptions, approvals, dependencies and fallback plans in one working brief.

Information to collect first

  • Current and reduced meal counts, service windows and menu requirements.
  • Equipment that remains safe and available after the incident assessment.
  • Site access, electrical service, fuel, water, wastewater and grease handling.
  • Required approvals from the authority having jurisdiction and the organization’s insurer.
  • A realistic restoration schedule with contingencies for inspection or construction delays.

Questions for the temporary-facility team

Ask which configuration supports the menu, how utility loads are documented, what the site must provide and which installation tasks depend on local contractors. Confirm transport, setup, rental or lease terms and demobilization in a written proposal.

KEEP FOOD SERVICE MOVING

One call.
A clearer recovery plan.

Share the facility, meal volume, location and expected recovery window. Our team is available by phone 24/7.

+1-888-385-5513 ↗